Primavera Training

by BTree Systems Claim Listing

This Primavera Course in Chennai by BTree Systems will help you become an expert in Primavera p6 software with real-time projects.

Price : Enquire Now

Contact the Institutes

Fill this form

Advertisement

BTree Systems Logo

img Duration

Enquire Now

Course Details

Looking for the best Primavera Training in Chennai? Well, look at BTree Systems one of the prominent Primavera Training Institute in Chennai best provider of Primavera course in Chennai.

This Primavera Course in Chennai by BTree Systems will help you become an expert in Primavera p6 software with real-time projects.

The Primavera P6 course will offer a hands-on experience that will enhance your career. This Primavera software training in Chennai provides a comprehensive overview of project management and resource management, portfolio management, etc., using Primavera p6's web-based application.

You will learn how to create a work breakdown structure, assign resources, resolve schedule delays, etc. In this course, students will prepare for the 1Z0-567 exam and 1Z0-567 exam (Oracle Project Portfolio Management Cloud 2019).

 

Overview of Primavera Course in Chennai

Primavera p6 is comprehensive, high-performance, multi-project planning, and control software. This training course covers all the essential concepts required for primavera p6 software, such as creating and scheduling, assigning resources, executing and controlling, adding activities, etc.

The primavera software is specifically designed for managing projects in several industries, including energy, construction, IT, and manufacturing.

It is ideal for project-intensive industries. For those who are new to Primavera software. This best primavera p6 online training will teach learners how to use the features of Primavera.

It provides useful information for project managers as well as all project professionals, such as engineers, schedulers, and more, who plan, manage, and report on the project.

By the end of the Oracle Primavera P6 Training in Chennai, you will have complete knowledge of how to manage the entire project lifecycle using this powerful program.

 

Primavera Certification Skills Covered

  • Project Management Fundamentals

  • Navigating the Primavera P6 Interface

  • Building a Work Breakdown Structure (WBS)

  • Adding Activities

  • Scheduling

  • Resource Management

  • Cost Management

  • Baseline Development

  • Reporting and Analysis

  • User and Access Management

  • Customization

 

Curriculum For Primavera Training

Data, navigating, and layouts

  • Describe facts specific to the enterprise and projects.

  • Log in

  • Open a current project.

  • Use the Home window and the Activities window to navigate.

  • Open a current design

  • Modify the layout

  • Save a design

Organisational Project Structure

  • Describe the components that comprise the Enterprise Project Structure

  • View the EPS

Creating A Project

  • Develop a project.

  • Explore the Projects pane.

  • View and alter data in the project details

Creating A Work Breakdown Structure

  • Make a Work Breakdown Structure definition

  • Make a hierarchy of a WBS with several levels.

Adding Activities

  • Describe a task and its elements.

  • Describe the various types of activities.

  • Include actions

  • Add a Notebook subject to a task.

  • Step up a game or activity.

  • Give activities activity codes.

Creating Relationships

  • View a network logic diagram

  • Differentiate between the four relationship types

  • Create relationships in the Activity Network

  • Create relationships in Activity Details

Scheduling

  • Pass both forward and backward.

  • Explain float, how it affects a timetable, and the significance of a crucial path

  • Determine the loops and open ends.

  • Establish a schedule.

  • Examine the report from the scheduling log.

Assigning Constraints

  • Apply an overall deadline to a project

  • Apply a constraint to an individual activity

  • Add notebook topics to constrained activities

  • Describe the available constraint types

Maintaining The Project Documents Library

  • Describe the difference between a work product and a reference document

  • Create a document record

  • Link the document record to a project document or work product

  • Assign the project document to an activity or WBS

Formatting Schedule Data

  • Group tasks based on a given criterion

  • Sorting exercises

  • Use a filter

  • Establish a filter

Roles And Resources

  • Identify roles

  • the roles dictionary is viewed

  • Identify the resources

  • Determine the variations among labour, nonlabor, and material resources.

  • look at the reference dictionary

Assigning Roles

  • Assign roles to an activity

  • Assign rates on roles

Assigning Costs And Resources

  • Role-based resource allocation

  • Assign activities with labour, nonlabor, and material resources.

  • Adjust Resource Budgeted Units/Time

  • Charge costs to activities

Analyzing Resources

  • Display the Resource Usage Profile

  • Format a profile

  • Format the timescale

Optimizing The Project Plan

  • Analyses the dates on the schedule.

  • reduce a project's timeline

  • Assess the availability of resources

  • Delete any excess resource allocations

  • Identify project expenses.

Base lining The Project Plan

  • Create a baseline plan

  • Display baseline bars on the Gantt Chart

  • Modify the bars on the Gantt Chart

Project Execution And Control

  • Describe several methods for updating the project schedule

  • Use Progress Spotlight

  • Status activities

  • Reschedule the project

Reporting Performance

  • Explain reporting procedures.

  • Schedule report generation

  • Using the Report wizard, create a resource report.

  • Make a distributed time report.

  • Use the existing layout to create a report.

  • Create and launch a project Web site

  • Customize the appearance of a project Web site

  • Publish activity layouts as an HTML page

 

Primavera Training Certification

The certification provided by the BTree system is valid for a lifetime and the certification is only provided when the course has been completed successfully.

The skills you have gained from our training with live projects, case studies and practice sessions can add value to your profile apart from online self-learn certifications.

This certification has no expiry limit, so you can make use of the certification in future too.

  • Nandanam Branch

    New No-11 Old No-5 6 th Street, Nandanam Extension, Nandanam, Chennai

Check out more Primavera courses in India

CADD Centre Kannur Logo

Primavera Advanced

Primavera is comprehensive, high performance, multi-project planning and control software. It is ideal for project-intensive industries. Primavera helps organizations manage just about any type of portfolio. Primavera gives a multitude of ways to organize, filter and sort activities.

by CADD Centre Kannur [Claim Listing ]
Cadd Talent Z Logo

Primavera

Primavera course training is offered by Cadd Talent Z for all skill level. Our mission is to offer nationally competitive and internationally recognized opportunities for learning, discovery and engagement to a diverse population of students in a real-world setting.

by Cadd Talent Z [Claim Listing ]
C-Tech BIM Logo

Primavera Training

When it comes to the primavera training institute in coimbatore c techbim, there is always a first preference. Primavera is a comprehensive, high-performance project planning and management software. Ideal for high-project-intensity sectors. The platform allows companies to work for almost any port...

by C-Tech BIM
Apex Consultants Logo

Primavera P6

Interested in Primavera P6? We, at Apex Consultancy, provide the platform to learn about Primavera P6 from the basics. The course is designed in such a way that anyone who has a craze for computer and project management tools can learn it easily.

by Apex Consultants [Claim Listing ]
IAFC Institute Logo

Primavera , MS Project, PMP Concepts

Primavera depicts a group of figures in an orange grove (which may reflect the fact that the Medici family had adopted the orange tree as its family symbol). To the far left of the painting stands Mercury dissipating the clouds of winter with his staff for spring to come.

by IAFC Institute [Claim Listing ]

© 2024 coursetakers.com All Rights Reserved. Terms and Conditions of use | Privacy Policy