This Primavera Course in Chennai by BTree Systems will help you become an expert in Primavera p6 software with real-time projects.
Looking for the best Primavera Training in Chennai? Well, look at BTree Systems one of the prominent Primavera Training Institute in Chennai best provider of Primavera course in Chennai.
This Primavera Course in Chennai by BTree Systems will help you become an expert in Primavera p6 software with real-time projects.
The Primavera P6 course will offer a hands-on experience that will enhance your career. This Primavera software training in Chennai provides a comprehensive overview of project management and resource management, portfolio management, etc., using Primavera p6's web-based application.
You will learn how to create a work breakdown structure, assign resources, resolve schedule delays, etc. In this course, students will prepare for the 1Z0-567 exam and 1Z0-567 exam (Oracle Project Portfolio Management Cloud 2019).
Overview of Primavera Course in Chennai
Primavera p6 is comprehensive, high-performance, multi-project planning, and control software. This training course covers all the essential concepts required for primavera p6 software, such as creating and scheduling, assigning resources, executing and controlling, adding activities, etc.
The primavera software is specifically designed for managing projects in several industries, including energy, construction, IT, and manufacturing.
It is ideal for project-intensive industries. For those who are new to Primavera software. This best primavera p6 online training will teach learners how to use the features of Primavera.
It provides useful information for project managers as well as all project professionals, such as engineers, schedulers, and more, who plan, manage, and report on the project.
By the end of the Oracle Primavera P6 Training in Chennai, you will have complete knowledge of how to manage the entire project lifecycle using this powerful program.
Primavera Certification Skills Covered
Project Management Fundamentals
Navigating the Primavera P6 Interface
Building a Work Breakdown Structure (WBS)
Adding Activities
Scheduling
Resource Management
Cost Management
Baseline Development
Reporting and Analysis
User and Access Management
Customization
Curriculum For Primavera Training
Data, navigating, and layouts
Describe facts specific to the enterprise and projects.
Log in
Open a current project.
Use the Home window and the Activities window to navigate.
Open a current design
Modify the layout
Save a design
Organisational Project Structure
Describe the components that comprise the Enterprise Project Structure
View the EPS
Creating A Project
Develop a project.
Explore the Projects pane.
View and alter data in the project details
Creating A Work Breakdown Structure
Make a Work Breakdown Structure definition
Make a hierarchy of a WBS with several levels.
Adding Activities
Describe a task and its elements.
Describe the various types of activities.
Include actions
Add a Notebook subject to a task.
Step up a game or activity.
Give activities activity codes.
Creating Relationships
View a network logic diagram
Differentiate between the four relationship types
Create relationships in the Activity Network
Create relationships in Activity Details
Scheduling
Pass both forward and backward.
Explain float, how it affects a timetable, and the significance of a crucial path
Determine the loops and open ends.
Establish a schedule.
Examine the report from the scheduling log.
Assigning Constraints
Apply an overall deadline to a project
Apply a constraint to an individual activity
Add notebook topics to constrained activities
Describe the available constraint types
Maintaining The Project Documents Library
Describe the difference between a work product and a reference document
Create a document record
Link the document record to a project document or work product
Assign the project document to an activity or WBS
Formatting Schedule Data
Group tasks based on a given criterion
Sorting exercises
Use a filter
Establish a filter
Roles And Resources
Identify roles
the roles dictionary is viewed
Identify the resources
Determine the variations among labour, nonlabor, and material resources.
look at the reference dictionary
Assigning Roles
Assign roles to an activity
Assign rates on roles
Assigning Costs And Resources
Role-based resource allocation
Assign activities with labour, nonlabor, and material resources.
Adjust Resource Budgeted Units/Time
Charge costs to activities
Analyzing Resources
Display the Resource Usage Profile
Format a profile
Format the timescale
Optimizing The Project Plan
Analyses the dates on the schedule.
reduce a project's timeline
Assess the availability of resources
Delete any excess resource allocations
Identify project expenses.
Base lining The Project Plan
Create a baseline plan
Display baseline bars on the Gantt Chart
Modify the bars on the Gantt Chart
Project Execution And Control
Describe several methods for updating the project schedule
Use Progress Spotlight
Status activities
Reschedule the project
Reporting Performance
Explain reporting procedures.
Schedule report generation
Using the Report wizard, create a resource report.
Make a distributed time report.
Use the existing layout to create a report.
Create and launch a project Web site
Customize the appearance of a project Web site
Publish activity layouts as an HTML page
Primavera Training Certification
The certification provided by the BTree system is valid for a lifetime and the certification is only provided when the course has been completed successfully.
The skills you have gained from our training with live projects, case studies and practice sessions can add value to your profile apart from online self-learn certifications.
This certification has no expiry limit, so you can make use of the certification in future too.
IT Training is an integral sector of improving the competence of the corporate labor force. BTree comprehends that corporate training is distinct from any other academic or professional training program, as it has to be highly customized and specific to meet the set objectives of the organization.
BTree can take specific work-related issues, and design short and effective software training programs which can swiftly equip your resources to get rid of any skill gaps and put those priority projects back on the fast track.
Merit Global's interactive training course will help you leverage the various facets of Oracle Primavera P6 V18.8 to organize projects with up to 100,000 activities.
Primavera depicts a group of figures in an orange grove (which may reflect the fact that the Medici family had adopted the orange tree as its family symbol). To the far left of the painting stands Mercury dissipating the clouds of winter with his staff for spring to come.
Primavera course is offered by Parametric Solutions Pvt Ltd. Our main objective is to provide qualitative training/services and give personal attention and feedback about progress to students and professionals through periodical tests.Â
Primavera course training is offered by Core Softech for all skill level. Interior designers make the closet space practical, safe, and delightful by identifying space requirements and selecting decorative items like color, lighting, and materials.Â
Primavera course is offered by CAD Skill Solution. Our Institute seeks to provide the best training and placement assistance to professionals & Students in industries.
© 2024 coursetakers.com All Rights Reserved. Terms and Conditions of use | Privacy Policy