Primavera P6 Professional Project Management, the recognized standard for high-performance project management software, is designed to handle large-scale, highly sophisticated, and multifaceted projects.
Primavera P6 Professional Project Management, the recognized standard for high-performance project management software, is designed to handle large-scale, highly sophisticated, and multifaceted projects.
It can be used to organize projects up to 100,000 activities, and it provides unlimited resources and an unlimited number of target plans. Massive data requires sophisticated yet highly flexible organization tools to provide you with a multitude of ways to organize, filter, and sort activities, projects, and resources.
In addition, Primavera P6 can be integrated with most financial and HR software. It features best-in-class integration for bringing together schedule, cost, and other vital project data to form a “single version of the truth” for greater speed, accuracy, and efficiency in reporting.
Lesson 1: Resource Optimization
Reviewing Resource Loading
Resource Assignments Window
Copying and Pasting into Excel
Other Tools for Histograms and Tables
Methods of Resolving Resource Peaks and Conflicts
Resource Leveling
Leveling Examples ( Leveling with and without Positive Float)
Resource Shifts
Guidelines for Leveling
What to look for if Resources are Not Leveling
Resource Curves
Workshop: Resources Optimization
Lesson 2 – Updating a Resourced Schedule
Understanding Budget Values and Baseline Projects
Understanding the Current Data Date
Information Required to Update a Resourced Schedule
Project Window Defaults for Updating a Resourced Schedule
Activities Window: Percent Complete Types
Using Steps to Calculate Activity Percent Complete
Updating the Schedule
Updating Resources
Updating Expenses
Workshop: Updating a Resourced Schedule
Lesson 3: Other Methods of Organizing Project Data
Understanding Project Breakdown Structures
Activity Codes
User-Defined Fields
WBS Category or Project Phase
Resource Codes
Cost Accounts
Owner Activity Attribute
Workshop: Activity Codes and User-Defined Fields (UDF)
Lesson 4: Global Change
Introducing Global Change
The Basic Concepts of Global Change
Specifying the Change Statements
Examples of Simple Global Changes
Selecting the Activities for Global Change
Duration Calculations with Global Change
(Any of the following) and (All of the following) Temporary Values
Global Change Functions
More Advanced Examples of Global Change
Workshop: Global Change
Lesson 5: Managing the Enterprise Environment
Multiple User Data Display Issues
Enterprise Project Structure (EPS)
Project Portfolios
Organizational Breakdown Structure (OBS)
Users, Security Profiles, and Organizational Breakdown Structure
Project Codes
Filtering, Grouping, and Sorting Projects in the Projects Window
Project Durations in the Projects Window
Why are some data fields gray and cannot be edited?
Summarizing Projects
Job Services
Tracking Window
Lesson 6: Multiple Project Scheduling
Multiple Projects in One Primavera Project
Multiple P6 Primavera Projects Representing One Project
Setting Up Primavera Projects as Sub-projects
Refresh Data and Commit Changes
Who has the project open?
Setting Baselines for Multiple Projects
Restoring Baselines for Multiple Projects
Lesson 7: Utilities
Reflection Projects
Advanced Scheduling Options ( Calculating and Displaying Multiple Paths)
Audit Trail Columns
Excel Import and Export Tool
Project Import and Export
Check-In and Check-Out
UN/CEFACT XML format
Online HTML Help
Activity Discussion Feature
Lesson 8 – Earned Value
Performance Measurement Baseline
Planned Value
Earned Value
Actual Costs
Estimate to Complete
Activity Usage:::::: S-Curves
Sample Graphical S-Curves
Our long-standing success is based on our instructors bringing real-world experience to the classroom and providing engaging, relevant, and high-quality course curriculum.
PRIMAVERA software is a unique tool that can be used for Project Planning, Controlling, Monitoring and Reporting. It is very useful for all Project Managers to track project activities, timely completion, resource management, incurred costs.
Oracle Primavera p6 a project, program and portfolio management tool. it is used for planning, managing and executing your project work. It is designed to handle large and small projects in a number of diverse industries, such as construction, manufacturing, energy, and IT.
Learn to add activities, assign resources, create a baseline, plan, schedule and more. It also explores resource management and advanced project management techniques using P6 Professional. Learn new ways to manage resources and analyze project performance.
This course teaches students how to use primavera to Manage projects from start to finish. Students will be able to use this software to design, Supervise and Implement projects based on International Standards.
Oracle Primavera P6 is a project, program, and portfolio management tool. It is used for planning, managing, and executing your project work. It is designed to handle large and small projects in a number of diverse industries, such as construction, manufacturing, energy, and IT.
© 2024 coursetakers.com All Rights Reserved. Terms and Conditions of use | Privacy Policy