Construction Scheduling With Primavera® (P6)

by UCLA Extension Claim Listing

This course presents an in-depth study of the current systems and techniques applied in construction planning, scheduling, control, and delay impact analysis.

$1299

Contact the Institutes

Fill this form

Advertisement

UCLA Extension Logo

img Duration

Enquire Now

Course Details

This course presents an in-depth study of the current systems and techniques applied in construction planning, scheduling, control, and delay impact analysis.

Instruction emphasizes the Critical Path Method approach to developing baseline schedules, progress measurement, earned value, integrated management systems, and as-planned versus as-built analysis.

The course also includes hands-on computerized scheduling using Primavera Systems software. 

 

What you can learn.

  • Identify the components of a construction schedule and how they are developed

  • Learn the steps and perform a critical path analysis with a given set of activities

  • Understand how scheduling software determines the critical path

  • Develop work breakdown structures and schedule activities from a recently constructed project's plans

  • Gain a thorough understanding of how to use Primavera P6 to create, update, and communicate construction schedules

  • Los Angeles Branch

    10960 Wilshire Blvd. Suite 1600, Los Angeles

© 2025 coursetakers.com All Rights Reserved. Terms and Conditions of use | Privacy Policy