You must hold or be prepared to get a White Card – CPCWHS1001 Prepare to Work Safely in the Construction Industry units of competency before you undertake any practical work
Course Information
We have great trainers who are with you every step of the way and our Brisbane traffic classes include 8 hours theory training and we organise 20 hours practical placement to complete your course with an approved Traffic Management Company
You must have held a driver’s licence, foreign, provisional or open, within the last 5 years.
You must hold or be prepared to get a White Card – CPCWHS1001 Prepare to Work Safely in the Construction Industry units of competency before you undertake any practical work
You must be mentally and physically fit to work. You will be required to provide your own PPE to complete the training including or equivalent to:
Hardhat
Safety sunglasses
Regulated long sleeve traffic control fluoro shirt
Lace up safety boots
Work pants (with the mandatory fluoro stripes above and below the knees)
5-watt UH850 S titanium radios (Uniden or something similar)
A Stop/ Slow Bat (1.8M height).
Department of Transport and Main Roads requires that you receive a Ready Reckoner as part of your training resource and this is included in your special price.
We arrange your 20 hours vocational placement and when this is completed, we arrange your final assessment. You then receive your Statement of Attainment which you can take to Department of Transport and Main Roads to lodge with your licence application.
Read the Information sheet – Medical Fitness.
Read the Information sheet – How to Become an Accredited Traffic Controller for information about entry requirements, our processes, your obligations and responsibilities as an accredited traffic controller.
Read the Approved Traffic Controller course information and frequently asked questions fact sheet for information about the traffic controller training course including the requirement for 20 hours of logbook experience for traffic controller trainees.
This unit describes the skills and knowledge required to control vehicle and pedestrian traffic using stop-slow bats, hand signals and approved communication devices in the resources and infrastructure industries. It applies to those working in operational roles.
They generally work in teams in live traffic environments under some degree of supervision. You will learn how to prepare to control traffic, control traffic and operate communication devices and conduct housekeeping activities.
Increase employment opportunities with this course
Fully prepared, experienced and capable upon completion
Must hold a General Construction Induction Card (White Card or Blue Card)
At ATA TESOL Australia, we have some amazing opportunities that will allow you to have the best time of your life travelling the world and getting paid to teach conversational English!
Teaching abroad for a summer, a whole year, or as your dream career will leave you with an unforgettable life experience that will create plenty of stories to share with everyone back home.
© 2025 coursetakers.com All Rights Reserved. Terms and Conditions of use | Privacy Policy