Microsoft Project (Essentials)

by Training Washington Claim Listing

In this hands-on course, we’ll show you how to use Microsoft Project to schedule and manage projects both large and small. Set up projects, add and link tasks, assign resources, fix scheduling issues, deal with resource conflicts, and track project progress.

Price : Enquire Now

Contact the Institutes

Fill this form

Advertisement

Training Washington Logo

img Duration

2 Days

Course Details

In this hands-on course, we’ll show you how to use Microsoft Project to schedule and manage projects both large and small. Set up projects, add and link tasks, assign resources, fix scheduling issues, deal with resource conflicts, and track project progress.

 

Content:

  • Introduction
    • round table
    • agenda
  • Working with Project
    • using the ribbon
    • navigating the backstage view
    • finding commands
  • Setting Up Project Files
    • creating and saving projects
    • creating a project from a template
    • creating a project from an excel workbook
    • setting up calendars
    • defining working and nonworking time
    • setting basic options
  • Creating Tasks
    • manual and auto scheduling
    • creating a manual task
    • creating an autoscheduled task
    • creating a milestone task
    • creating a recurring task
    • copying tasks from another program
    • creating a summary task
    • displaying summary tasks
    • organizing tasks in a task list
    • work breakdown structure codes
  • Linking and Timing tasks
    • linking tasks
    • adding lag or lead time
    • setting task date constraints
    • viewing tasks and task links
  • Creating Resources
    • understanding resources
    • creating a work resource
    • creating a material resource
    • costs for work and material resources
    • creating a cost resource
  • Assigning Tasks to Resources
    • understanding duration, work, and units
    • assigning resources to tasks
    • using team planner to assign resources
    • finding overallocations
    • assigning resources
    • modifying resource assignments
    • replacing resources on a task
  • Working with Views
    • choosing a view
    • working with a table
    • inserting and rearranging table columns
    • changing the settings for columns in a table
    • displaying two views at the same time
    • using the timeline view
    • sorting tasks and resources
    • grouping tasks and resources
    • filtering tasks and resources
    • modifying task bar styles and task bar text
    • modifying task bar layout
    • modifying text formatting
  • Washington DC Branch

    1050 Connecticut Ave NW, Washington DC

© 2025 coursetakers.com All Rights Reserved. Terms and Conditions of use | Privacy Policy