Planning Scheduling & Controlling using Primavera P6

by PCSS Consultancy Sdn Bhd Claim Listing

This 2 days programme is essential for completing projects on time using critical path method (CPM). It serves as a basis to understanding the projects performance to enable better decision making in controlling the project duration costs.

Price : Enquire Now

Contact the Institutes

Fill this form

Advertisement

PCSS Consultancy Sdn Bhd Logo

img Duration

2 Days

Course Details

This 2 days programme is essential for completing projects on time using critical path method (CPM). It serves as a basis to understanding the projects performance to enable better decision making in controlling the project duration costs. It also serves as a basis for the project planning role, to ensure the incumbent understands the processes required to generate decision making information with the help of Primavera P6.

  • Kuching Branch

    C2-3-7, Lot 19853, Block 11, MTLD, Canaan Square, Kuching
  • Miri Branch

    Lot 1917, Block E & F, 2nd Floor, Miri
  • Kuala Lumpur Branch

    Suite 8.01, 8th Floor, Menara IGB, Mid Valley City, Lingkaran Syed Putra, 59200, Kuala Lumpur

© 2025 coursetakers.com All Rights Reserved. Terms and Conditions of use | Privacy Policy