Primavera P6 Training

by Overseas Industrial Technical Institute

Study of Verifying the materials, which are receiving in warehouse were having the standards mentioned in the job specifications. Study of Preparing preliminary punch-list prior to client’s walk down.

Price : Enquire Now

Contact the Institutes

Fill this form

Advertisement

Overseas Industrial Technical Institute Logo

img Duration

Please Enquire

Course Details

We are a leading service provider for Quility and Control (QC) Inspecto Training. With vast industry experience, we are engaged in offering Training service for Quality and Control (QC) Inspector, The areas we cover in these service are study of Site surveillance report, Non confirmation reports (NCR) primary inspection, final inspection, Raising Request for inspection (RFI), Raising Mechanical Completion Documents (MCD), Raising Ready for Commissioning (RFC) Punch created by category A,B,C, Punch clearance by category A,B,C, 

 

Our services include: 

Study of Preparing Inspection Test Plans (ITP) and Quality Control Procedure (QCP) for the specific projects with reference to project procedure and job specifications. Study of Forecasting the requirements of QCP forms against each tag per system/subsystem.

Study of Verifying the materials, which are receiving in warehouse were having the standards mentioned in the job specifications. Study of Preparing preliminary punch-list prior to client’s walk down.

Study of Preparing the Discrepancy Report for the items which is not meeting the project standards. Study of Verifying the MCC to make sure all the tags were included, and the inspections were completed which have been mentioned in the system Study Inspections of all kinds of instruments installation.

Verifying all activity carried out according to approved installation drawings / standards. Study of Preparing surveillance reports for all kind of instrumentation activities at site. Study of Inspection for the cable installation included trench and tray installation.

Study of Preparing punch-list for vendor package items/ skids. Study of Verifying all instruments to make sure no punch- items are present prior to loop checking. Study Inspection & Witnessing according to Project Specification, QCP, ITP & Method of Statement, International standard and other approved reference Document as per Company standard.

Study of Issuing (NCR) Non-conformance report, (CAR) Corrective action Report, (PTQR) Project technical Query Report, (DR) Damage Report when the specification or procedural requirements are not met.

Study of Installation / mechanical Completion for Instrumentation system. DCS/PLC/ESD/FAS-System Cabinet, Marshaling cabinet, Junction Box, Field mounted instrument like PT, TT, FT, LT Switches, Gauge’s, and MOV & Control Valves Etc.

Study of Installation of Fire & Gas, Telecommunication System in the Field such as Push Button, Horn & Beacon and Fire & Smoke Detection and Analytical Instrument. Study of Installation of CCTV camera & Speakers Field, Electrical Substation and Main Control Building.

Study of Visual inspection of all types of electronics & Pneumatic instrument like PT, TT, FT, LT Switches, Gauge’s & Control Valves, MOV etc, and Witnessing the calibration of Instrument at site Calibration workshop & field. Study of Inspection for installation & rooting of Instrument Air Piping, Tubing /Impulse tubing, and Witnessing the Pressure & Leak Test.

Study of Inspection for Laying, Dressing, Glanding and Termination for EC, LV, MV, HV Control, Power & instrument (UG/AG) Cable. Study of Inspection for the Instrument Cable Trenches prior to cable Pulling and after Cable Pulling to release for the next activities.

Inspection for Cable Rooting, Dressing and tagging in side cable trench. Study of Inspection of Cable trays and Conduit in the Field and inside Control Building. Study of Inspection for the Installation of Earthing (Grounding) Cable and Bus bar in the Field and Buildings and Connection to the equipment as per the approved drawing and specification.

Study of Inspection for the Cable IR & meggering testing Study of Familiar with international standards ISA, IEC, ANSI, API, NEC, NEMA, NFPA, BS etc. Study of discipline punch list are created for Inspection Hold point and completed before the requirement, clearing the punch list.

Study of updating the ITR Inspection Test report, taking client signature for his approval, Submitting the ITR to Certification department for record keeping , system updating.  

  • Taltala Branch

    Block – A, 2nd floor, 91, Ripon St, Taltala, Kolkata

Check out more Primavera courses in India

ABC Training Logo

Primavera

Primavera course is offered by ABC Training. You will be able to develop a schedule, update and monitor this schedule, control this schedule, generate reports, allocate cost and resources.

by ABC Training [Claim Listing ]
  • Price
  • Start Date
  • Duration
KR Automation Computer Training Center Logo

Primavera

Primavera course training is offered by KR Automation Computer Training Center for all skill level. Along with this course we have expert faculties who provide a lot of different other courses.

by KR Automation Computer Training Center [Claim Listing ]
C Cube Technologies Logo

Primavera

Primavera course is Offered by C Cube Technologies.

by C Cube Technologies [Claim Listing ]
Techno Globe Logo

Primavera Training

Primavera Systems Inc. gives undertaking and program administration programming for the Architecture, Engineering and Construction industry.

by Techno Globe [Claim Listing ]
Jees Enterprise Solutions (JES) Logo

Oracle Primavera P6

Oracle Primavera P6 is offered by Jees Enterprise Solutions (JES). Project Management International Standards unit of Jees Enterprise Solutions (JES) which is a fast growing Project Management Consulting and Training Services company.

by Jees Enterprise Solutions (JES) [Claim Listing ]

© 2024 coursetakers.com All Rights Reserved. Terms and Conditions of use | Privacy Policy