SAP QM Training

by Uplatz Claim Listing

SAP QM has huge scope in getting placements,and competition will be less, hence once you learn this course from us you will click in interview withing 5 attemts, we will teaching topic wise with respect to your understanding levels with reak time scenarios.

Price : Enquire Now

Contact the Institutes

Fill this form

Advertisement

Uplatz Logo

img Duration

30 Hours

Course Details

SAP QM  has huge scope in getting placements,and competition will be less, hence once you learn this course from us you will click in interview withing 5 attemts, we will teaching topic wise with respect to your understanding levels with reak time scenarios.

 

Content:

  • 1.0. SAP OVERVIEW
  • 1.1. General discussion about SAP and its importance
  • 1.2. Organization structure
  •          . Company
  •          . Company code
  •          . Plant
  •         .  Quality set up at Plant Level qs51
  •         . Quality set up at Client Level  qs41
  • 1.3.   SAP landscape
  •        .   Sandbox
  •        .   Development
  •        .   Quality
  •        .  Production
  • 1.4. SAP Architecture
  •        . Database
  •        . Application
  •        . Presentation
  • 2.0 Overview of QM
  • . Overview of QM in Domain industries
  • . Role of QM in supply chain management
  • 3. MASTERDATA OF QM.
  • .     Overview
  • ·      Creation of Material Master 
  • ·       Activation of material with Quality view
  • ·      Creation of Master inspection characteristics (Quantitative)
  • .      Creation of Master inspection characteristics (Qualitative)
  • .      Edit catalogue
  • .      Edit selected set
  • .     Sampling procedure
  • .     Sampling scheme
  • 4.  PLANNING & Execution
  • ·      Creation of inspection plan
  • .      Assigning of Master inspection characteristics
  • .      Creation of inspection lot
  • .      Results Recording
  • .      Usage Decision
  •  5. Various QM Scenarios
  • .    In coming inspection
  • .    In process inspection
  • .   Final inspection
  • .   Service inspection   
  • .   Audit Inspection
  • .   Calibration Inspection
  • .   Physical sample inspection
  • .   Direct assignment of MIC`S to material 
  • .   Defect notification process
  • .   Statistical process control process
  • .   Quality certificate             
  •    6. in coming inspection Scenario  QM INTEGRATION WITH MM
  •       .  Activation of inspection type for Incoming material
  •       .  Creation of inspection plan
  •        . Inspection lot creation or generation
  •        . Results Recording
  •        . Usage Decision
  • 7.  in process inspection Scenario QM INTEGRATION WITH PP
  •  
  •       .  Activation of inspection type for in process inspection for material
  •       . Assignment of MIC`s in Operations in routing
  •        . Production order creation &Inspection lot generation
  •        . Results Recording
  •        . Usage Decision
  •  
  •  
  •  
  •  
  •  8.   Final inspection Scenario QM INTEGRATION WITH PP
  •  
  •         .  Activation of inspection type for final inspection for material
  •       .  Creation of inspection plan
  •        . Inspection lot generation at the time of Goods receipt for Production order
  •        . Results Recording
  •        . Usage Decision
  •  9. Service inspection Scenario  
  • . Creation of material as Service
  • .  Creation of inspection plan
  •  . Inspection lot creation or generation
  •  . Results Recording
  •   . Usage Decision
  • 10. AUDIT inspection Scenario
  • . Creation of department as material
  • .  Activation of inspection type for audit inspection for department as material
  • .  Creation of inspection plan
  •  . Inspection lot creation
  •  . Results Recording
  •   . Usage Decision
  •  
  • 11. Calibration order QM integration with PM
  • .  Creation of equipment
  • .Creation of task list with inspection point
  • .Assign of MIC`s to operation
  •  
  • . Creation of maintenance calibration plant
  • .Scheduling of plant to generate maintenance order to get inspection lot
  •  . Results Recording
  •   . Usage Decision
  • 12.  Physical sample inspection process Scenario
  •  .   Activation of inspection type for material
  • .    Creation of inspection plan
  • .    Creation of physical sample
  • .    Creation of physical sample lot
  • .    Results Recording
  •   .  Usage Decision
  •  
  • 13.   Direct assignment of MIC`S to material Scenario
  • . Activation of quality view with inspection with material specs
  • . Direct assignment of MIC`S to material
  • .Inspection lot creation
  • . Results Recording
  •   . Usage Decision
  • 14.   Defect notification process Scenario
  •  .  Activation of inspection type for material
  • .  Creation of inspection plan
  •  . Inspection lot creation
  •  . Results Recording
  • .  Rejection of MICS
  • . Generation of notification
  • .Processing and closing the notification
  •   . Usage Decision
  • 15.   Statistical process control process Scenario
  • .  Activation of inspection type for material
  • .  Creation of MIC`S with SPC control indicator
  • .Define control charts
  • and more
  • Milton Keynes Branch

    63, Chelsea House, 599 Witan Gate, Milton Keynes

© 2025 coursetakers.com All Rights Reserved. Terms and Conditions of use | Privacy Policy